| Plot No. |
Area (Tentative) |
| |
(SQMT) |
| 1 |
43211.00 |
| 2 |
43904.00 |
| 3 |
3614.00 |
| 4 |
2335.00 |
| 5 |
4235.00 |
| 6 |
4651.00 |
| 7 |
2227.00 |
| 8 |
2515.00 |
| 9 |
2559.00 |
| 10 |
3077.00 |
| 11 |
2623.00 |
| 12 |
1426.00 |
| 13 |
10818.00 |
| 14 |
2418.00 |
| 15 |
3130.00 |
| 16 |
2614.00 |
| 17 |
1247.00 |
| 18 |
1000.00 |
| 19 |
1000.00 |
| 20 |
1028.00 |
| 21 |
1329.00 |
| 22 |
1346.00 |
| 23 |
1675.00 |
| 24 |
1247.00 |
| 25 |
1257.00 |
| 26 |
6291.00 |
| 27 |
3908.00 |
| 28 |
4363.00 |
| 29 |
4825.00 |
| 30 |
4768.00 |
| 31 |
4345.00 |
|
| |
Amenities and Infrastructure Details |
| |
|
|
| |
• |
High quality concrete roads to
take heavy loads |
| |
|
|
| |
• |
Street lighting to illuminate the park |
| |
|
|
| |
• |
Water supply facility to each plot |
| |
|
|
| |
• |
Storm water drain system |
| |
|
|
| |
• |
Facility of electrical supply
to each plot |
| |
|
|
| |
• |
Provision of administrative
building for entire industrial park |
|